Al- Salman for water Compact
Total Project: 11,224,000 USD.
Location: IRAQ – Al Muthana – Al Salman Area.
Contain : Ductile Iron Pipes, Fittings, Valves, Submersible Pumps, Stainless steel Pipes, RO. Units , Control Board ..
Capacity Production: 900 M3/ Day.
Serving High Pure Water Quality: 50,000 People population.
Date: Starting Date: 2007. Closing Date: 2008.
The Project Contain a lot of work, SEC worked with the Fourth Dimension for General Contract & Al Mabrook for General Contract in the Project with a hard effort and it got succeeding.S E C has supplied and provides all the services for this project as it is a part from the People who search for water.S E C Products are standard and under SGS Inspection Certificates Requested, and the materials Got approved from the Iraqi Government and according to the high working, the work was with Ductile Iron Pipes 300 & 200 mm. and According to Best Manufacturing Products. S E C Provided the Fittings as Flanged Taper, Flanged Tees, Double socket Tee, Socket Bend, Flange Socket and others. S E C supplied a High Quality Valves included the Ductile Iron pipes, fittings and Valves. S E C supplied the Over Head Cranes with a High Quality, all Auto Cad Designing made by a best engineers, and all SGS Inspection Certificate are included in this project. S E C Transport the Goods with a careful attention and to the F.O.T Location Project. S E C is a Professional in the subject of Shipping and transportation. 
S E C also Help the Contractor By Providing the full Helping to make him succeed in this Project. The Important subject to satisfy the Customer and Government that Our Company is able and willing to work with a quick and honest way. S E C Has Honor to view the Project as Pictures to show the succeeding and trusting. S E C thanks the People who gave us this trust and we will keep the honest for the other Customers with the same way. As a Contractor, sub – Contractor S E C can give a High Quality Project.

 

Al – Amal For Water Compact
Total Project: 14,530,000USD.
Project Location: IRAQ – Al Husianiya Area.
Project Contain : 28,000 Meter Ductile Iron Pipes DN 600 & 400DN
Capacity Production: 800 M3/ Hour.
Serving High Pure Water Quality: More than 100,000 People population.
Starting Date: 2009, Closing Date: 2010.
 

The Project contained a lot of work, SEC worked with the Fourth Dimension for General Contract and succeeding in it.

Totally Ductile Iron pipes Production is about 4250 Tones with 28,000 Meter supplied with a High Quality. All the documents confirmed by the government as a succeeding Project.

SEC has to thank the Contractor, Government and who support the company.

We heard thanking way from many people who live in this area and come to visit Jordan. We believe that we are able to succeed in any project that we work.

As a Contractor, sub – Contractor S E C can give a High Quality Project.

 

Al – Simawa  For  waste Water Project
Al Simawa for waste water station pipeline Project is a Big Project with 60 Million USD. As we have partners in the world we want to show how much working needs and how many Arab Professional we have between hands.
Project under working of The 4th dimension for General Contracting Co.
We are able to work as contractor – Sub – Contractor with an honest Way!
 
Projects in IRAQ others governor  
  Water Treatment Plant; Pumping station; Design and Implementation for International Soft Drink Co. / Mosul (Date: 2001 -2003).
  Water Treatment Plant; Pumping station Design and Implementation for Al Nile Soft Drinks Co. / Baghdad
(Date: 1998 – 2000).
Consulting in IRAQ  
  Mandli Water Pumping Station (5400 m3/h. & 260 m. Head) (Date: 2007)
  RO Water Treatment Plant with pumping station for BaghdadAir Port (Date: 2007)
  Arbil/ Badawa Water Pumping and Elevated Storage Tanks Design.(Date: 2005)
  Sanitary System and Pipes Net design in Diala (Date 2005).
  Sanitary System and Pipes Net design in MosulCity (Date: 2005).
 
Auto Cad Designing  in IRAQ  
  Design and I implementation of RO plant of 200 m3/h in Iraq- Simawa.
  Design of 1000 m3/h. RO Plant for Basrah.
  Design of 8000 m3/h. Dewatering Sewage plant in Egypt.
  Karbala Waste Treatment Plant contracting and design
  Design of 500 m3/h. Compact Water Treatment Plant
  Design for 500 m3/h. RO Water Treatment Plant for Chemical Industry.

 